Wallbridge Commences Drilling at Martiniere
TORONTO, March 14, 2025 (GLOBE NEWSWIRE) -- Wallbridge Mining Company Limited (TSX: WM, OTCQB: WLBMF) (“Wallbridge” or the “Company”) is pleased to announce that it has commenced drilling at its Martiniere gold project (“Martiniere”) located approximately 30 km west of the Company’s flagship Fenelon gold project in northwestern Quebec.
The Company is continuing to explore the broader mineralized gold system at Martiniere. Exploration is focused along the Bug Lake deformation corridor where drilling in 2024 returned multiple high grade intercepts from three satellite targets located within 100 to 500 metres of the currently defined mineral resource (see Wallbridge news releases datedJuly 31, 2024 andNovember 6, 2024). The first hole of the 2025 program is targeting the down-plunge extension of the newly identified Dragonfly zone which has so far been delineated approximately 500 metres along strike and to a vertical depth ranging from 75 to 200 metres below surface. Drilling is also planned to follow up on positive results returned from the Horsefly and Martiniere North target areas.
During 2025 the Company plans to complete a total of 10,000 to 15,000 metres of drilling at Martiniere. The first phase of drilling is planned to be completed in May 2025. Based on the results of the first drilling phase, which are expected to be reported by the end of the second quarter, a second phase is planned to commence during the latter half of July.
Additionally, generative exploration to identify earlier stage greenfields targets within the Company’s 830 km2 regional property position along the Detour-Fenelon gold trend continues.
About Wallbridge Mining
Wallbridge is focused on creating value through the exploration and sustainable development of gold projects in Quebec’s Northern Abitibi region while respecting the environment and communities where it operates. The Company holds a contiguous mineral property position totaling 830 km2 that extends approximately 97 km along the Detour-Fenelon gold trend. The property is host to the Company’s flagship PEA stage Fenelon Gold Project, and its earlier exploration stage Martiniere Gold Project.
For further information please visit the Company’s website at https://wallbridgemining.com/ or contact:
Brian Penny, CPA, CMA CEO Email: bpenny@wallbridgemining.com M: +1 416 716 8346 | Tania Barreto, CPIR Director Investor Relations Email: tbarreto@wallbridgemining.com M: +1 289 819 3012 |
Cautionary Note Regarding Forward-Looking Information
The information in this document may contain forward-looking statements or information (collectively, “FLI”) within the meaning of applicable Canadian securities legislation. FLI is based on expectations, estimates, projections, and interpretations as at the date of this document.
All statements, other than statements of historical fact, included herein are FLI that involve various risks, assumptions, estimates and uncertainties. Generally, FLI can be identified by the use of statements that include, but are not limited to, words such as “seeks”, “believes”, “anticipates”, “plans”, “continues”, “budget”, “scheduled”, “estimates”, “expects”, “forecasts”, “intends”, “projects”, “predicts”, “proposes”, "potential ", “targets” and variations of such words and phrases, or by statements that certain actions, events or results “may”, “will”, “could”, “would”, “should” or “might”, “be taken”, “occur” or “be achieved.”
FLI in this document may include, but is not limited to; the Company’s exploration plans; the future prospects of Wallbridge; statements regarding the results of the PEA; future drill results; the Company’s ability to convert inferred resources into measured and indicated resources; environmental matters; stakeholder engagement and relationships; parameters and methods used to estimate the mineral resource estimates (“MRE”) at the Fenelon and Martiniere properties (collectively the “Deposits”); the prospects, if any, of the Deposits; future drilling at the Deposits; and the significance of historic exploration activities and results.
FLI is designed to help you understand management’s current views of its near- and longer-term prospects, and it may not be appropriate for other purposes. FLI by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such FLI. Although the FLI contained in this document is based upon what management believes, or believed at the time, to be reasonable assumptions, the Company cannot assure shareholders and prospective purchasers of securities of the Company that actual results will be consistent with such FLI, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither the Company nor any other person assumes responsibility for the accuracy and completeness of any such FLI. Except as required by law, the Company does not undertake, and assumes no obligation, to update or revise any such FLI contained in this document to reflect new events or circumstances. Unless otherwise noted, this document has been prepared based on information available as of the date of this document. Accordingly, you should not place undue reliance on the FLI, or information contained herein.
Furthermore, should one or more of the risks, uncertainties or other factors materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in FLI.
Assumptions upon which FLI is based, without limitation, include: the results of exploration activities, the Company’s financial position and general economic conditions; the ability of exploration activities to accurately predict mineralization; the accuracy of geological modelling; the ability of the Company to complete further exploration activities; the legitimacy of title and property interests in the Deposits; the accuracy of key assumptions, parameters or methods used to estimate the MREs and in the PEA; the ability of the Company to obtain required approvals; geological, mining and exploration technical problems; and failure of equipment or processes to operate as anticipated; the evolution of the global economic climate; metal prices; foreign exchange rates; environmental expectations; community and non-governmental actions; and, the Company’s ability to secure required funding. Risks and uncertainties about Wallbridge 's business are discussed in the disclosure materials filed with the securities regulatory authorities in Canada, which are available at www.sedarplus.ca.
Cautionary Notes to United States Investors
Wallbridge prepares its disclosure in accordance with NI 43-101 which differs from the requirements of the U.S. Securities and Exchange Commission (the "SEC "). Terms relating to mineral properties, mineralization and estimates of mineral reserves and mineral resources and economic studies used herein are defined in accordance with NI 43-101 under the guidelines set out in CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted by the Canadian Institute of Mining, Metallurgy and Petroleum Council on May 19, 2014, as amended. NI 43-101 differs significantly from the disclosure requirements of the SEC generally applicable to US companies. As such, the information presented herein concerning mineral properties, mineralization and estimates of mineral reserves and mineral resources may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the U.S. federal securities laws and the rules and regulations thereunder.

© 2025 GlobeNewswire, Inc. All Rights Reserved.