Orla Mining Reports Fourth Quarter 2024 Financial Results
Orla Mining Reports Fourth Quarter 2024 Financial Results |
[18-March-2025] |
Continued Operating Outperformance and Musselwhite Addition Provides Momentum for Catalyst-Rich 2025 VANCOUVER, BC, March 18, 2025 /CNW/ - Orla Mining Ltd. (TSX: OLA) (NYSE: ORLA) ("Orla" or the "Company") today announces the results for the fourth quarter and year ended December 31, 2024. (All amounts expressed in U.S. dollars unless otherwise stated) Fourth Quarter 2024 Highlights
"2024 marked a pivotal year for Orla, with record production from Camino Rojo and the addition of the Musselwhite Mine expanding our footprint into Canada. While detailed guidance will be provided in the second quarter, we expect that adding Musselwhite production will more than double 2024 production. We intend to continue to invest in growth and exploration across the entire portfolio."
Financial and Operations Update
Fourth Quarter 2024 Financial and Operations Summary The Camino Rojo Oxide Gold Mine produced 26,531 ounces of gold in the fourth quarter of 2024 at an average ore stacking rate of 18,487 tonnes per day. The average mining rate during the fourth quarter was 50,238 tonnes per day with a strip ratio of 1.54. The higher strip ratio in the quarter is a result of a mine pit redesign to ensure consistent access to ore to maintain balanced production. The average grade of ore stacked during the fourth quarter was 0.94 g/t gold, in-line with plan. Gold sold during the fourth quarter 2024 totaled 33,288 ounces and cash costs and AISC totaled $550 and $826 per ounce of gold sold, respectively. Sustaining capital during the fourth quarter of 2024 totaled $2.4 million. On November 11, 2024, the Company completed and re-submitted the environmental permit application for the Camino Rojo pit extensions and layback. Musselwhite Acquisition On November 18, 2024, Orla announced the acquisition of the Musselwhite Mine from Newmont Corporation for upfront cash consideration of $810 million and gold-linked contingent consideration of $40 million. The transaction closed on February 28, 2025. This acquisition builds on Orla's established track record of development and operating success and is aligned with the Company's strategy for growth and value creation, as exemplified by an over 500% share return in the Company's less than 10-year history. The addition of Musselwhite transforms Orla into a multi-asset intermediate producer with production expected to more than double, based on the 2024 technical report4. The transaction was structured to take advantage of Orla's strong balance sheet and financial flexibility and avoids any upfront equity dilution. The $810 million in upfront consideration has been funded through a $250 million credit facility, a $360 million gold pre-payment facility, and $200 million in senior unsecured convertible notes. Refer to the Company's news release from March 3, 2025 for specific details on each facility. Musselwhite is a producing, underground gold mine located on the shore of Opapimiskan Lake in Northwestern Ontario. It has been in operation for over 25 years, having produced close to 6 million ounces of gold to date, with a long history of resource growth and conversion. Based only on the Musselwhite Technical Report, Musselwhite has a mine life until 2030 with average annual gold production of 202 koz at $1,269/oz AISC. Significant opportunities exist to optimize the operation and extend mine life through known extensions of the ore body. Exploration Update In the fourth quarter, exploration focused on drilling activities at Camino Rojo in Mexico and the South Carlin Complex (including the South Railroad Project) in Nevada. For 2024, a total of 61,384 metres were drilled, with 42,375 metres in Mexico and 19,009 metres in Nevada. In 2025, the Company plans to invest $30 million in exploration across Mexico and Nevada. Orla intends to begin aggressively exploring at Musselwhite and 2025 guidance will be provided in the second quarter. Camino Rojo, Mexico: In Mexico during the fourth quarter, the Company completed the drill campaign at Camino Rojo extension, now referred to as "Zone 22". The first year of drilling in Zone 22 successfully defined mineralization up to 0.9 kilometres from the current resource boundary, with the system remaining open down plunge and at depth. The upper portion of Zone 22 is expected to form an initial inferred resource, which will be integrated into the underground resources of the Camino sulphide deposit planned for the second quarter 2025. South Carlin Complex, Nevada: In Nevada, 2024 marked another successful year of exploration at the South Carlin Complex, with significant drill results at multiple targets over the entire 30-kilometre property strike length. Highlights include the intersections of high-grade oxide mineralization outside the projected open-pit limits at Dark Star and Pinion, indicating potential for extensions and resource growth. In the South Area of the property, extended by the acquisition of Contact Gold's Pony Creek property in early 2024, drilling focused on gold-bearing structural trends identified by geochemical anomalies, resulting in shallow oxide mineralization at multiple targets. This drilling, along with a notable intersection within the Bowl deposit, strengthens confidence in the potential for additional oxide resource definition.
Musselwhite, Ontario: The 2025 exploration plan at Musselwhite has been defined, with ongoing drilling to focus on underground exploration to expand resources and reserves. The Company plans to reactivate an aggressive surface exploration program beginning in the second quarter, including deep drilling on the down-plunge extension of the mine trend to expand resources and to support technical studies for potential future production increases. Exploration plans also include testing near-mine targets in the second half of 2025. South Railroad Project Update The South Railroad Project, situated on federal land, is currently advancing under the guidance of the US Bureau of Land Management (BLM) in accordance with the National Environmental Policy Act (NEPA) for permitting. The Environmental Impact Statement (EIS) contractor is finalizing the Supplemental Environmental Reports (SERs) required by the BLM prior to issuing the Notice of Intent (NOI). The NOI is expected to be published in the first half of 2025, with the Company targeting a Record of Decision (final permitting decision) by mid-2026. Following this approval, construction on the South Railroad Project would commence, with first gold production anticipated in 2027. The Engineering, Procurement, and Construction Management (EPCM) contract has been awarded to M3 Engineering & Technology Corp. Basic engineering has commenced and will proceed throughout 2025 and 2026 to support the start of construction following the Record of Decision. Long-lead equipment will be identified, with purchase orders potentially beginning in 2025. 2025 Guidance Summary (Preliminary) The Company's preliminary 2025 guidance is set forth below. This preliminary guidance does not reflect the benefits of the Company's acquisition of the Musselwhite Mine from Newmont Corporation, which closed on February 28, 2025. Updated 2025 guidance, including the Musselwhite Mine and corporate G&A will be provided during the second quarter.
Financial Statements Orla's audited financial statements and management's discussion and analysis for the year ended December 31,2024, are available on the Company's website at www.orlamining.com, and under the Company's profiles on SEDAR+ and EDGAR. Qualified Persons Statement The scientific and technical information in this news release was reviewed and approved by Mr. J. Andrew Cormier, P. Eng., Chief Operating Officer of the Company, and Mr. Sylvain Guerard, P. Geo., Senior Vice President, Exploration of the Company, who are the Qualified Persons as defined under NI 43-101 - Standards of Disclosure for Mineral Projects. Fourth Quarter 2024 Conference Call Orla will host a conference call on Wednesday March 19, 2025, at 10:00 AM, Eastern Time, to provide a corporate update following the release of its financial and operating results for the fourth quarter 2024: Dial-In Numbers / Webcast: USA - Toll-Free: +1 (888) 672-2415 About Orla Mining Ltd. Orla's corporate strategy is to acquire, develop, and operate mineral properties where the Company's expertise can substantially increase stakeholder value. The Company has three material projects, consisting of two operating mines and one development project, all 100% owned by the Company: (1) Camino Rojo, in Zacatecas State, Mexico, an operating gold and silver open-pit and heap leach mine. The property covers over 139,000 hectares which contains a large oxide and sulphide mineral resource, (2) Musselwhite Mine, in Northwestern Ontario, Canada, an underground gold mine that has been in operation for over 25 years and produced close to 6 million ounces of gold, with a long history of resource growth and conversion, and (3) South Railroad, in Nevada, United States, a feasibility-stage, open pit, heap leach gold project located on the Carlin trend in Nevada. The technical reports for the Company's material projects are available on Orla's website at www.orlamining.com, and on SEDAR+ and EDGAR under the Company's profile at www.sedarplus.ca and www.sec.gov, respectively. NON-GAAP MEASURES We have included herein certain performance measures ("non-GAAP measures") which are not specified, defined, or determined under generally accepted accounting principles ("GAAP"). These non-GAAP measures are common performance measures in the gold mining industry, but because they do not have any mandated standardized definitions, they may not be comparable to similar measures presented by other issuers. Accordingly, we use such measures to provide additional information, and you should not consider them in isolation or as a substitute for measures of performance prepared in accordance with GAAP. In this section, all currency figures in tables are in thousands, except per-share and per-ounce amounts. AVERAGE REALIZED GOLD PRICE
NET CASH
ADJUSTED EARNINGS AND ADJUSTED EARNINGS PER SHARE
Companies may choose to expense or capitalize costs incurred while a project is in the exploration and evaluation phase. Our accounting policy is to expense these exploration costs. To assist readers in comparing against those companies which capitalize their exploration costs, we note that included within Orla's net income for each period are exploration costs which were expensed, as follows:
FREE CASH FLOW
CASH COST AND ALL-IN SUSTAINING COST
EXPLORATION AND PROJECT DEVELOPMENT COSTS
Forward-looking Statements This news release contains certain "forward-looking information" and "forward-looking statements" within the meaning of Canadian securities legislation and within the meaning of Section 27A of the United States Securities Act of 1933, as amended, Section 21E of the United States Exchange Act of 1934, as amended, the United States Private Securities Litigation Reform Act of 1995, or in releases made by the United States Securities and Exchange Commission, all as may be amended from time to time, including, without limitation, statements regarding the Company's production and cost outlook, including expected production, AISC, processing throughputs, operating costs, sustaining and non-sustaining capital expenditures, exploration and development expenditures, and general corporate and administrative expenses; the Company's exploration program, including timing, expenditures, and the goals and results thereof; the timing of permitting, construction, and production at South Railroad; and mineral resource estimates. Forward-looking statements are statements that are not historical facts which address events, results, outcomes or developments that the Company expects to occur. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made and they involve a number of risks and uncertainties. Certain material assumptions regarding such forward-looking statements were made, including without limitation, assumptions regarding: the future price of gold and silver; anticipated costs and the Company's ability to fund its programs; the Company's ability to carry on exploration, development, and mining activities; the Company's ability to successfully integrate the Musselwhite Mine; tonnage of ore to be mined and processed; ore grades and recoveries; decommissioning and reclamation estimates; currency exchange rates remaining as estimated; prices for energy inputs, labour, materials, supplies and services remaining as estimated; the Company's ability to secure and to meet obligations under property agreements, including the layback agreement with Fresnillo plc; that all conditions of the Company's credit facility will be met; the timing and results of drilling programs; mineral reserve and mineral resource estimates and the assumptions on which they are based; the discovery of mineral resources and mineral reserves on the Company's mineral properties; the obtaining of a subsequent agreement with Fresnillo to access the sulphide mineral resource at the Camino Rojo Project and develop the entire Camino Rojo Project mineral resources estimate; that political and legal developments will be consistent with current expectations; the timely receipt of required approvals and permits, including those approvals and permits required for successful project permitting, construction, and operation of projects; the timing of cash flows; the costs of operating and exploration expenditures; the Company's ability to operate in a safe, efficient, and effective manner; the Company's ability to obtain financing as and when required and on reasonable terms; that the Company's activities will be in accordance with the Company's public statements and stated goals; and that there will be no material adverse change or disruptions affecting the Company or its properties. Consequently, there can be no assurances that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements involve significant known and unknown risks and uncertainties, which could cause actual results to differ materially from those anticipated. These risks include, but are not limited to: uncertainty and variations in the estimation of mineral resources and mineral reserves; risks related to the Company's indebtedness and gold prepayment; risks related to exploration, development, and operation activities; foreign country and political risks, including risks relating to foreign operations; tailings risks; reclamation costs; delays in obtaining or failure to obtain governmental permits, or non-compliance with permits; environmental and other regulatory requirements; delays in or failures to enter into a subsequent agreement with Fresnillo with respect to accessing certain additional portions of the mineral resource at the Camino Rojo Project and to obtain the necessary regulatory approvals related thereto; the mineral resource estimations for the Camino Rojo Project being only estimates and relying on certain assumptions; loss of, delays in, or failure to get access from surface rights owners; uncertainties related to title to mineral properties; water rights; risks related to natural disasters, terrorist acts, health crises, and other disruptions and dislocations; financing risks and access to additional capital; risks related to guidance estimates and uncertainties inherent in the preparation of feasibility studies; uncertainty in estimates of production, capital, and operating costs and potential production and cost overruns; the fluctuating price of gold and silver; risks related to the Cerro Quema Project; unknown labilities in connection with acquisitions; global financial conditions; uninsured risks; climate change risks; competition from other companies and individuals; conflicts of interest; risks related to compliance with anti-corruption laws; volatility in the market price of the Company's securities; assessments by taxation authorities in multiple jurisdictions; foreign currency fluctuations; the Company's limited operating history; litigation risks; the Company's ability to identify, complete, and successfully integrate acquisitions; intervention by non-governmental organizations; outside contractor risks; risks related to historical data; the Company not having paid a dividend; risks related to the Company's foreign subsidiaries; risks related to the Company's accounting policies and internal controls; the Company's ability to satisfy the requirements of Sarbanes–Oxley Act of 2002; enforcement of civil liabilities; the Company's status as a passive foreign investment company (PFIC) for U.S. federal income tax purposes; information and cyber security; the Company's significant shareholders; gold industry concentration; shareholder activism; other risks associated with executing the Company's objectives and strategies; as well as those risk factors discussed in the Company's most recently filed management's discussion and analysis, as well as its annual information form dated March 18, 2025, which are available onwww.sedarplus.ca and www.sec.gov. Except as required by the securities disclosure laws and regulations applicable to the Company, the Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change. Past results are not indicative of future performance. SOURCE Orla Mining Ltd. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Company Codes: AMEX:ORLA, Toronto:OLA |